CJIS Topological Interconnectivity Drawing Documents Communication Paths, Circuits and Components, v1.0

Defines conformance and assessment criteria for verifying that an organization's network topological drawing documents all communications paths, circuits, and other components.
If an assessment step references organization-defined elements (E.g. <organization-defined personnel or roles>, <organization-defined frequency>, etc.), corresponding citations/excerpts must be provided to confirm that the organization has established and documented these values and that they apply as referenced in the conformance criteria.

Similarly, if a "Selection" among multiple options (e.g. [Selection (one or more): as needed; ]) is specified, evidence must be provided to establish that the option(s) implemented by the organization have been defined and documented.

The assessment step shall not be marked as satisfied without this evidence.

Assessment Step

1
System Network Diagram - Identified Items (SystemNetworkDiagram-IdentifiedItems)
Does the organization's network topological drawing include all communications paths, circuits, and other components used for the interconnection, beginning with the organization-owned system(s) and traversing through all interconnected systems to the remote end-point?
Artifact
A1
Provide evidence (e.g. organizational policies, procedures, compliance/assessment reports, etc.) that support the assessor's response to this assessment step.
If conformance criteria reference organization-defined elements (e.g. <organization-defined personnel or roles>, <organization-defined frequency>, etc.), these values must be defined and documented by the organization.

Similarly, if the criteria specify a "Selection" among multiple options (e.g. [Selection (one or more): as needed; ]), the option(s) implemented by the organization must also be defined and documented.

Conformance Criteria (1)

C1
The network topological drawing shall include the following:
1. All communications paths, circuits, and other components used for the interconnection, beginning with the agency-owned system(s) and traversing through all interconnected systems to the agency end-point.
Citation
CJIS-SP-V5-4
Section 5.7.1.2.