Predictable Failure Prevention | Standby Component Installation, v1.0

Defines conformance and assessment criteria for verifying that an organization, if information system component failures are detected, ensures that the standby components are successfully and transparently installed within organization-defined time period.
If an assessment step references organization-defined elements (E.g. <organization-defined personnel or roles>, <organization-defined frequency>, etc.), corresponding citations/excerpts must be provided to confirm that the organization has established and documented these values and that they apply as referenced in the conformance criteria.

Similarly, if a "Selection" among multiple options (e.g. [Selection (one or more): as needed; ]) is specified, evidence must be provided to establish that the option(s) implemented by the organization have been defined and documented.

The assessment step shall not be marked as satisfied without this evidence.

Assessment Step

1
Predictable Failure Prevention | Standby Component Installation (PredictableFailurePreventionStandbyComponentInstallation)
Does the organization, if information system component failures are detected, ensure that the standby components are successfully and transparently installed within [Assignment: organization-defined time period]?
Artifact
A1
Provide evidence (e.g. organizational policies, procedures, compliance/assessment reports, etc.) that support the assessor's response to this assessment step.
Parameter
Installation Time Periodrequired
NUMBER : Provide the time period (in hours) within which standby components are installed.
If conformance criteria reference organization-defined elements (e.g. <organization-defined personnel or roles>, <organization-defined frequency>, etc.), these values must be defined and documented by the organization.

Similarly, if the criteria specify a "Selection" among multiple options (e.g. [Selection (one or more): as needed; ]), the option(s) implemented by the organization must also be defined and documented.

Conformance Criteria (1)

C1
The organization, if information system component failures are detected, ensures that the standby components are successfully and transparently installed within [Assignment: organization-defined time period].
Citation
SP800-53R4
Appendix F, SI-13 (4)[a]